# High-Speed Press Transfer Cell

> Technical coordination and detailed design for a 2-second-cycle press cell integrating several specialist vendors’ equipment.

- Customer: High-volume manufacturer
- Industry: Industrial Equipment
- Service: Automation Engineering
- Capabilities: Machine Design, Mechanical Design, Documentation & Sourcing

## Results at a glance

- **2 sec** cycle time

## The challenge

- Bring specialized material-handling equipment from several expert companies together into one high-volume cell
- Minimize delays at cell start-up

## What APTUS did

- Overall technical management and communication across all parties
- Detailed design work and documentation tying the machinery together

## Results

- Runs around the clock in a high-production environment
- Integrated into the customer’s existing product lines

Source: https://www.aptusdesignworks.com/work/high-speed-press-transfer-cell
